PCM600 projects - Arc protection - Bay control and measurement - Motor protection - Transformer protection - 2 winding - Busbar differential protection (low impedance) - Feeder protection - Voltage regulation - Busbar protection (voltage and frequency) - Capacitor bank protection - Interconnection protection - Power management/Load shedding - Back-up protection - Engineering Manual - SSC600 Smart substation control and protection - 1.5 - IEC - ANSI - 17.04.2023

SSC600 and SSC600 SW Engineering Manual

A typical project in PCM600 contains a plant structure including one or several IED objects, where each IED object contains the engineering data created or modified using the different PCM600 tools.

Several projects can be created and managed by PCM600, but only one project can be active at a time.

Regardless the protocol used in installation for each project, the IEC 61850 version must be selected when adding the first IED to plant structure. After the initial selection, all IEDs in plant structure use the selected version, either Edition 1 or Edition 2. In case the IEC 61850 is not used for station bus, the default version can be applied. By default, the IEC 61850 version of PCM600 is Edition 1. The IED's IEC 61850 version is by default Edition 2.

With PCM600, it is possible to do various tasks.

  • Open existing projects
  • Import projects
  • Create new projects
  • Export projects
  • Delete projects
  • Rename projects
  • Copy and paste projects

The extension of the exported project file is .pcmp. The files are only used for exporting and importing projects between PCM600s.