Installing connectivity packages by using the connectivity package installer - Arc protection - Bay control and measurement - Motor protection - Transformer protection - 2 winding - Busbar differential protection (low impedance) - Feeder protection - Voltage regulation - Busbar protection (voltage and frequency) - Capacitor bank protection - Interconnection protection - Power management/Load shedding - Back-up protection - Engineering Manual - SSC600 Smart substation control and protection - 1.5 - IEC - ANSI - 17.04.2023
SSC600 and SSC600 SW Engineering Manual
-
Close PCM600.
-
Run the ABB IED Connectivity Package SSC600 Ver. n.msi installer. (n = version number)
-
To install the connectivity package, follow the steps in the connectivity package installation wizard.