IEC 61850 interface in the IED - Arc protection - Bay control and measurement - Motor protection - Transformer protection - 2 winding - Busbar differential protection (low impedance) - Feeder protection - Voltage regulation - Busbar protection (voltage and frequency) - Capacitor bank protection - Interconnection protection - Power management/Load shedding - Back-up protection - Engineering Manual - SSC600 Smart substation control and protection - 1.5 - IEC - ANSI - 17.04.2023

SSC600 and SSC600 SW Engineering Manual

Figure 1. IEC 61850 communication interface principle
LN GOOSE Send Communication handler IEC 61850 protocol C ommands Event handler Event queue Command / IN / OUT interface AF part GOOSE Send GOOSE Receive FBs with monitoring and commands FBs with monitoring only GOOSE interf . FB AF L LN part FB AF L LN part FB AF L LN part LN GOOSE Send FB s GOOSE Receive FB s GOOSE Receive SMV Send SMV Receive SMV interf ace FB SMVSENDER FB s GOOSE Receive FB s SMV Monitoring

IEC 61850 provides a method for identifying all signals that belong to a function. These signals are identified through the logical nodes representing the functions. All signal information for commands and monitoring are available in logical nodes.

Whenever a function block is instantiated in the Application Configuration tool, PCM600 automatically generates the corresponding logical node data.