Adding new IEC 61850 clients for the IEC 61850 Configuration tool - Arc protection - Bay control and measurement - Motor protection - Transformer protection - 2 winding - Busbar differential protection (low impedance) - Feeder protection - Voltage regulation - Busbar protection (voltage and frequency) - Capacitor bank protection - Interconnection protection - Power management/Load shedding - Back-up protection - Engineering Manual - SSC600 Smart substation control and protection - 1.5 - IEC - ANSI - 17.04.2023

SSC600 and SSC600 SW Engineering Manual

Adding a new IEC 61850 client to a PCM600 project is a two-step operation. First, a new generic IEC 61850 IED object must be created under the plant structure and the relevant client ICD or CID file must be imported to the generic IEC 61850 IED.
  1. Right-click a bay node in the project plant structure, point to New, then point to Generic IEC61850 IEC and select IEC61850 IED.
    Figure 1. Creating a generic IEC 61850 IED
  2. Rename the IED object as “Client_G”.
  3. Right-click the IED and then select Import.
    Figure 2. Selecting Import on the shortcut menu
  4. Select a valid Client SCL file (ICD or CID) and click Open in the file selection dialog box.
  5. Select Ignore PCM Object Type and then click Import in the SCL Import Options dialog box.
    Figure 3. Defining SCL import options
  6. Start the IEC61850 Configuration tool and select Client-Server communication as engineering mode.
    The newly added client should be present in the Clients column along with other clients in both the Data Set tab and the Report Controls tab.