Rebooting the software - Arc protection - Bay control and measurement - Merging unit - Operation Manual - SMU615 Substation Merging Unit - 1.0 - IEC - ANSI - 06.06.2023
SMU615 Operation Manual
- Click the Configuration menu in the left navigation bar and select General.
- Click Enable Write.
- Edit the Software reset parameter.
- In the New Value list, select Activate.
- Click Write to IED.