Rebooting the software - Arc protection - Bay control and measurement - Merging unit - Operation Manual - SMU615 Substation Merging Unit - 1.0 - IEC - ANSI - 06.06.2023

SMU615 Operation Manual

  1. Click the Configuration menu in the left navigation bar and select General.
  2. Click Enable Write.
  3. Edit the Software reset parameter.
    • In the New Value list, select Activate.
  4. Click Write to IED.