Network configuration - Arc protection - Auto synchronization - Bay control and measurement - Merging unit - Transformer protection - 2 winding - Feeder protection - Voltage regulation - Capacitor bank protection - Petersen Coil control - Grid automation - Busbar differential protection (high impedance) - Back-up protection - Motor protection - Busbar protection (voltage and frequency) - Transformer protection - 3 winding - Interconnection protection - Generator protection - Power management/Load shedding - IEC 61850 Engineering Guide - REX640 Protection and control - PCL6 - IEC - ANSI - 14.02.2023

REX640 IEC 61850 Engineering Guide

Before starting the FPN configuration of the relay, the ABB-specific configuration must be correct.

  • Potential additional subnetwork must be configured using PCM600 configuration.
  • The IED's access point must be defined using Ethernet Configuration in PCM600.
  1. In PCM600, right-click an IED in the plant structure and select Options.
  2. Enable the IEC 61850 configuration engineering mode.
    Figure 1. Enabling IEC 61850 configuration engineering mode
    image/svg+xml
  3. On the toolbar, select Subnetwork configuration from the drop-down list.
    Figure 2. Subnetwork configuration for REX640
    image/svg+xml
  4. Configure Ethernet ports in Ethernet Configuration.
    Figure 3. Configuring Ethernet ports
    image/svg+xml