Validation - Arc protection - Auto synchronization - Bay control and measurement - Merging unit - Transformer protection - 2 winding - Feeder protection - Voltage regulation - Capacitor bank protection - Petersen Coil control - Grid automation - Busbar differential protection (high impedance) - Back-up protection - Motor protection - Busbar protection (voltage and frequency) - Transformer protection - 3 winding - Interconnection protection - Generator protection - Power management/Load shedding - Engineering Manual - REX640 Protection and control - Relion Protection and Control - PCL6 - IEC - ANSI - 16.02.2023

REX640 Engineering Manual

Once the FPN mapping is complete, all mapping can be validated in three ways using the validate options available on the toolbar.

Figure 1. Validate mapping
image/svg+xml