Starting IED Compare - Arc protection - Auto synchronization - Bay control and measurement - Merging unit - Transformer protection - 2 winding - Feeder protection - Voltage regulation - Capacitor bank protection - Petersen Coil control - Grid automation - Busbar differential protection (high impedance) - Back-up protection - Motor protection - Busbar protection (voltage and frequency) - Transformer protection - 3 winding - Interconnection protection - Generator protection - Power management/Load shedding - Engineering Manual - REX640 Protection and control - PCL6 - IEC - ANSI - 16.02.2023
REX640 Engineering Manual
-
Start IED Compare in the shortcut menu in plant structure.
-
In the PCM600 plant structure, right-click Substation, Voltage level, Bay or IED.
-
Select IED Compare.
-
Start IED Compare from the PCM600 main menu.
-
Select Substation, Voltage level, Bay or IED in the PCM600 plant structure.
-
On the PCM600 menu bar, point to Tools and select IED Compare.