Starting IED Compare - Arc protection - Auto synchronization - Bay control and measurement - Merging unit - Transformer protection - 2 winding - Feeder protection - Voltage regulation - Capacitor bank protection - Petersen Coil control - Grid automation - Busbar differential protection (high impedance) - Back-up protection - Motor protection - Busbar protection (voltage and frequency) - Transformer protection - 3 winding - Interconnection protection - Generator protection - Power management/Load shedding - Engineering Manual - REX640 Protection and control - PCL6 - IEC - ANSI - 16.02.2023

REX640 Engineering Manual

  • Start IED Compare in the shortcut menu in plant structure.
    1. In the PCM600 plant structure, right-click Substation, Voltage level, Bay or IED.
    2. Select IED Compare.
  • Start IED Compare from the PCM600 main menu.
    1. Select Substation, Voltage level, Bay or IED in the PCM600 plant structure.
    2. On the PCM600 menu bar, point to Tools and select IED Compare.