Activating connectivity packages - Arc protection - Auto synchronization - Bay control and measurement - Merging unit - Transformer protection - 2 winding - Feeder protection - Voltage regulation - Capacitor bank protection - Petersen Coil control - Grid automation - Busbar differential protection (high impedance) - Back-up protection - Motor protection - Busbar protection (voltage and frequency) - Transformer protection - 3 winding - Interconnection protection - Generator protection - Power management/Load shedding - Engineering Manual - REX640 Protection and control - PCL6 - IEC - ANSI

REX640 Engineering Manual

The relay connectivity package has to be installed before it can be activated in Update Manager.

  1. Select Manage Connectivity Packages from the menu on the left column to access the installed connectivity packages.
  2. Browse the tree structure to find the correct product.
  3. Select the connectivity package version from the drop-down list beside the product name.
    Note: Always use the latest version of the connectivity package.
    Figure 1. Selecting the connectivity package versions

    PCM600 recognizes the installed connectivity packages during start-up, and the corresponding IED types are available in PCM600 when starting a new project.