Select the IED node in Plant Structure in Project Explorer.
Click the Report Controls tab.
Right-click the area containing the existing RCBs and select New to add a new RCB.
Figure 1. Adding a new report control block
Browse to LLN0 under LD0 to define where to place the RCB.
Give a unique name to the RCB.
In the drop-down list, select the previously created data set to link with the RCB.
Figure 2. Selecting a data set to be linked with the RCB
Edit the properties and options of the created RCB.
Figure 3. Editing the RCB properties
Note: Data set entries in a data set linked to the GCB can be modified from the RCB Control Block tab by selecting the Data Set Details in the shortcut menu.