Configuring GOOSE with IEC 61850 Configuration - Arc protection - Bay control and measurement - Merging unit - Transformer protection - 2 winding - Feeder protection - Voltage regulation - Capacitor bank protection - Grid automation - Busbar differential protection (high impedance) - Line differential protection - Back-up protection - Motor protection - Busbar protection (voltage and frequency) - Interconnection protection - Generator protection - Power management/Load shedding - IEC 61850 Engineering Guide - REX615 Protection and control - PCL2 - IEC - ANSI - 14.02.2023

REX615 IEC 61850 Engineering Guide

  1. Add devices to a PCM600 project.
  2. Engineer the GOOSE connections between the devices.
    1. Define the published GOOSE data and control blocks.
    2. Define the subscribing IEDs for the GOOSE data.
  3. Connect the GOOSE inputs in the IED applications.