Adding new IEC 61850 clients for IEC 61850 Configuration - Arc protection - Bay control and measurement - Merging unit - Transformer protection - 2 winding - Feeder protection - Voltage regulation - Capacitor bank protection - Grid automation - Busbar differential protection (high impedance) - Line differential protection - Back-up protection - Motor protection - Busbar protection (voltage and frequency) - Interconnection protection - Generator protection - Power management/Load shedding - IEC 61850 Engineering Guide - REX615 Protection and control - PCL2 - IEC - ANSI

REX615 IEC 61850 Engineering Guide

Adding a new IEC 61850 client to a PCM600 project is a two-step operation. First, a new generic IEC 61850 IED object must be created under the plant structure and then the relevant client ICD or CID file must be imported to the generic IEC 61850 IED.
  1. Right-click a bay node in the project plant structure, point to New, then point to Generic IEC61850 IEC and select IEC61850 IED.
    Figure 1. Creating a generic IEC 61850 IED
  2. Rename the IED object as “Client_G”.
  3. Right-click the IED and then select Import.
    Figure 2. Selecting Import on the shortcut menu
  4. Select a valid Client SCL file (ICD or CID) and click Open in the file selection dialog box.
  5. In the SCL Import Options dialog box, clickImport.
    Figure 3. Defining SCL import options

  6. Start IEC 61850 Configuration and select Client-Server communication as engineering mode.
The newly added client should be present in the Clients column along with other clients on both the Data Set tab and the Report Controls tab.