Select the IED node in Plant Structure in Project Explorer.
Click the Report Controls tab.
Right-click the area containing the existing report control blocks and select New to add a new report control block.
Figure 1. Adding a new report control block
Browse to any logical node where the data set is created to define where to place the report control block.
Give a unique name to the report control block.
In the drop-down list, select the previously created data set to link with the RCB.
Figure 2. Data set drop-down list
Edit the properties and options of the created report control block.
Figure 3. Report control block properties
Note: Data set entries in a data set linked to the RCB can be modified from the Report Control Block tab by selecting the Data Set Details in the shortcut menu.