IEC 61850 engineering process - Arc protection - Motor protection - Feeder protection - Back-up protection - Engineering Manual - REX610 Protection and control - Relion 615 series - 1.2.1 - IEC - ANSI - 03.05.2023

REX610 Engineering Manual

The IEC 61850 standard defines how information is communicated in a substation. The information communication can be divided into different parts.

  • Description of the substation part, including the used logical nodes
  • Description of the IEDs with their logical nodes
  • Description of the communication network
  • Description of the engineering process

When exporting an SCL file from PCM600, the tool builds a default substation structure and creates default data sets and control blocks for vertical communication between the substation client and IEDs. For more information, see the IEC 61850 standards.

In the following example, it is assumed that PCM600 and IET600 are used as the system configuration tools. Another option is to use the IEC 61850 Configuration tool inside PCM600. In that case the SCL file export and import operations (steps 1 and 3) are not needed.

  1. SCL files are exported from PCM600. In this case, a SCD file. It is also possible to export other SCL file types.
  2. Horizontal and vertical communication is configured using the station configuration tool, for example, IEC 61850 Configuration tool or IET600.
  3. SCL files are imported to a PCM600 project. In this case, it is the updated SCD file.
Figure 1. IEC 61850: signal engineering procedure flow when a complete station is exported as a SCD file
image/svg+xmlSCDfiledo IED engineeringexport SCD filePCM600 (1)create projectimport SCD fileconfigure data setsconfigure Report CBsconfigure GOOSE CBsexport SCD fileIET600(2)import SCD filelink GOOSE input dataWrite to IEDPCM600 (3)SCDfileIED1IED nIED 2IED n-1