For IEC 61850 engineering, a separate system configuration tool needs to be used with PCM600.
- Create a project in IET600. 1
- Import the SCD file created by PCM600. 1
-
Conduct vertical communication engineering (monitoring direction).
-
Configure and/or reconfigure the default data sets.
Note: Data sets meant for vertical reporting can only contain data on the data object level, not on the data attribute level.Note: The data set for GOOSE can contain signals on the data attribute or data object level. Data object level GOOSE entries can only be received of the following CDC types: SPS, SPC, ACD, ACT, DPS, DPC, INC, INS, ENC and ENS.
- Configure additional Report Control Blocks when needed for each data set used for vertical communication.
-
Link the IED clients to the Report Control Blocks.
Note: Up to five report clients can be configured.
-
Configure and/or reconfigure the default data sets.
-
Conduct horizontal communication engineering.
-
Configure GOOSE control blocks for each data set configured for GOOSE messages.
Note: One data can be included in the GOOSE data set only once.
- Define the client IEDs for each GOOSE control block.
- Link the IEDs to the GOOSE control block that is to receive the GOOSE control block.
-
Configure GOOSE control blocks for each data set configured for GOOSE messages.
-
Export the updated SCD file. 1
Note: All data sets, Report Control Blocks and GOOSE control blocks must be located in LLN0.
1 Applicable when using IET600