Installing connectivity packages by using the connectivity package installer - Grid automation - Engineering Manual - REC615 Grid Automation Protection and Control - RER615 Grid Automation Protection and Control - Relion 615 series - 2.0 - IEC - ANSI - 28.04.2023
REC615 and RER615 Engineering Manual
- Close PCM600.
- Run the ABB IED Connectivity Package RE_6xx Ver. n.msi installer.
(n = version number)
- To install the connectivity package, follow the steps in the connectivity package installation wizard.