Checking and updating DNP3 points - Grid automation - Engineering Manual - REC615 Grid Automation Protection and Control - RER615 Grid Automation Protection and Control - Relion 615 series - 2.0 - IEC - ANSI - 28.04.2023

REC615 and RER615 Engineering Manual

If DNP3 is used, the migrated DNP3 point list should for most part correspond to the configuration made in the old IED.
  1. Check the point list and verify that all the point types correspond to the old configuration and DNP3 master.
    • Analog input objects
    • Binary input objects
    • Binary output objects
    • Counter objects
    • Double bit indication objects
    • Analog output objects
  2. If some points have different point addresses or other mapping attributes, adjust them in the Communication Management tool.
  3. Add the possible missing points in the migrated configuration by taking them back to use in the Communication Management tool.