The relay connectivity package has to be installed before it can be activated in Update Manager.

  1. Select Manage Connectivity Packages from the menu on the left column to access the installed connectivity packages.
  2. Browse the tree structure to find the correct product.
  3. Select the connectivity package version from the drop-down list beside the product name.
    Note: Always use the latest version of the connectivity package.
  4. Click Apply to activate the connectivity package.
    Figure 1. Selecting the connectivity package versions
    image/svg+xml
    PCM600 recognizes the installed connectivity packages during start-up, and the corresponding IED types are available in PCM600 when starting a new project.